Planning Commission
Regular Meeting
December 21, 2005
7:00 p.m.
Present: S. Versluis, D. Brown, M. Houseman, C.Gornowich, J. Hickey,
Chairman; M. Huizenga, C. Rypma, T. Greeno, M. Ferris-Young. Also
Present: F. Wash, Planning Director, Scott Conners, Engineering and B.
Antcliff, Secretary.
Chairman Hickey opened the meeting and C. Rypma gave the invocation.
C. Rypma moved and M. Houseman supported the motion to approve the
Planning Commission minutes of December 7, 2005.
There was an opportunity for general public comment and none was
offered.
Case #04-370- VerWoert/Cambridge Grove RPUD-Public Hearing
Chairman Hickey read the request for final area site plan and
preliminary site condominium approval for the Cambridge Grove RPUD
consisting of 145 units and located west of Wilson Ave. on the south
side of Richmond St.
Planner Wash stated that the Planned Unit Development process in
Walker consists of three steps. The first step is a preliminary area
site plan, and this project has received that. The second step is a
rezoning decision by the City Commission and this property has now been
rezoned RPUD 1. The third step is where we are tonight, which is the
most important step from a site development stand point because it deals
with a construction plan and a land division plan. What we have before
us tonight is a final area site plan, which has details on it and there
are staff comments. The other item for review tonight is the preliminary
site condominium and that is the way the land is proposed to be divided.
It may look like a platted subdivision but is being proposed as a site
condominium with public streets. He went on to say that he recommends
tabling this plan but you have the option of conditionally approving the
plan because there is one more step for this plan which is final site
condo approval at the City Commission level. The staff would like to
have a solid deadline so we can ensure that the details of the plan are
taken care of in a timely manner.
Scott Conners stated that our standard procedure is to show sidewalks
on both sides of all public streets. We came up with some compromises
with the developer during site review process. One of the compromises
was to allow the sidewalk to be up against the back of the curb for a
short distance along both sides of the road but at that point the
sidewalk will have to be widened 8 ft. instead of 5 ft. This is a
standard variance that may be allowed in an area where there may be
wetlands where we cannot have a wide road section. The applicant wants a
sidewalk on just one side of the road. Our rules do not allow that. The
sidewalk has to be on both sides of the road.
Scott Conners went on to say that we are trying to maintain Kenowa’s
alignment to the south. It is an important road. In all of the meetings
that we have had on this project, this has not been adjusted.
Tom Greeno stated that he felt this change on Kenowa would be a good
one as it would straighten out Kenowa without having a turn.
C. Rypma asked what difference does it make if it is straightened or
if we leave it as it is?
Scott Conners replied that it is a transportation continuity kind of
thing. Kenowa is a name that we all know as a north, south street and
what we are doing here is to allow this street to vary from our county
line alignment. We want to maintain the street name and the continuity
down to Leonard St. because it does pick up further south in the south
part of the City.
Mike Houseman stated that when we went through the original rezoning,
didn’t we talk about the likelihood of Kenowa going through was not
going to happen because of some of the obstructions down toward Lake
Michigan Dr.?
Scott Conners replied there was some loose discussion about this but
no decision was ever made. That decision could be made today. He went on
to say that his recommendation was to adjust the alignment and have it
go through. On Piccadilly we need to have a temporary cul-de-sac or a
hammerhead built at the west end so that garbage trucks, mail vehicles,
can turn around. We have a built in compromise that if the developer
does not want to build a full size cul-de-sac there for temporary
purposes, we can build a hammerhead which is a T at the end and that
will allow snow plows, etc. to do a three point turn and get out of
there. In this case we are willing to accept either one of these
options. We have had a meeting with the Ottawa County Road Commission
and we talked with them about the alignment of Kenowa. We have some
issues to work out with the right-of-way from where it is a straight
north-south right-of-way. We can work through these issues. Ottawa
County has shown us a willingness to let us take over that short piece
of road so that we have continuity on that section of road. When Phase 2
goes in, and that Kenowa portion is constructed, Ottawa County and the
City of Walker will have an agreement to rework our borderline street
agreement so that the short piece of Kenowa that is a gravel road right
now could become jurisdiction for the City of Walker.
J. Hickey asked if that would be improved and be a public street
then?
Scott replied yes. He went on to say that we have spent a lot of time
on the drainage study here. We are going to have a 100 year storm
detention center provided. If we have a really bad 100 year storm
without any development, that flood level will not be raised at all with
the post development, when all the streets and houses are in. There are
5 detention ponds here. We try to work developments like this into one
or two ponds but in this case the detentions ponds are built to preserve
the drainage courses that we looked at in the beginning of the project.
These detention ponds are spaced upland at wetlands areas so that they
can treat the water before it goes into the wetlands. Because the
detention ponds are in backyard areas we cannot really get at them with
City vehicles so we would look to the Association to take care of those
and do the maintenance. The wetlands will not be used as detention as we
would see in a larger plat. The issue is maintenance and we do not want
to have any more of those than we need to.
M Ferris-Young asked if these ponds will be fenced?
S. Conners replied no, he did not think so. He stated we want to make
sure the drainage easements are mentioned in the association by-laws.
One point that we noticed during the drainage study is that there is a
deficiency at the down stream outlet and Dave Hendershot, who is the
engineer, went with me to Ottawa County to talk to them about trying to
fix that deficiency. Once we do get that worked out and we have the
right size pipe down stream, it would be constructed as part of Phase 2
in this plat. It is an easy condition. Right now we have a 24 in. pipe
leaving this site and it goes into a 21 in. pipe and that goes into a 15
in. pipe and we would not expect to see something like that. We want to
make sure that the 24 in. capacity is maintained so that we do not have
a new road built that floods every two years. He went on to say that in
the past we have had a lot of questions about the drainage on most of
the houses on Richmond. You have maps that show the natural drainage
course. That illustrates that most of those houses are much higher than
this development area and you can see the catch basins in the Orchard
Ridge Development across the street. Only a very small portion is not
being picked up in their backyard that would include the sidewalk along
the north side of Richmond. Their drainage should not be impacted by
this development.
Scott Conners stated that the proposed grading for lots 8 – 11 is
another issue that we have discussed before for quality building sites.
We have questions about those because there is not much of a flat spot
for those homes to be built on. We would like a conservation easement
over those wetlands to make sure that the builder on that site does have
to preserve those areas and knows he has a very restrictive area to work
in.
Ms. Ferris-Young asked how the developer works around these wetlands
without affecting it?
Scott Conners replied that they would have to safely slope down to it
but not go within that area. He went on to say that the next area to
discuss is fill. There are some areas that have as much as 10 ft. of
fill and there is a concern about the additional volume of material
coming in, what the time frame would be for depositing that material
would be, and the routes for trucking. The engineer here has said that
the site is going to be a balance which means no additional material
will be brought in except for the sand and gravel to build the road
which is great news. We want to get a statement to that effect. The park
access in Phase 2 should have 2 accesses one on each side of the open
park areas. It would be very easy to add a 10 ft. easement on the east
side between lots 53 & 56 to provide additional access to the area.
Because this project is a PUD, there will be a unique process on how the
property for right-of-way is going to be designated for the City. When a
project is platted, the right-of-way process on how we obtain that is
easier. We want to make sure that the solution for us to accept the
property is as close to the right-of-way that we can get.
Scott Conners stated that the last item here is the sanitary sewer.
We did send this project to Moore & Bruggink to have a review done and
how it relates to the sanitary sewer. We have not gotten into this
aspect of the project because the developers have been working with
Tallmadge Twp. side of the project. There is going to be a new pump
station built in Tallmadge Twp. that is going to serve Phases 2 through
5. That pump station has been designed for some down stream
restrictions, which has a limit on what can be built here. As designed,
there were 128 lots proposed to go to the west through Tallmadge Twp.
The pump station design that they have in place will only allow for 113
lots. We have two choices, either the development can be reduced by 15
lots or they can go back and look at Phase 2 or 3 and see if they can
route the sanitary sewer from those areas to the north to Richmond where
we do have additional capacity. That will be a technical decision. After
a plan like this gets approved, we look at very detailed road
construction plans. We will work out more details through that process.
Chairman Hickey asked when Tallmadge anticipates building this pump
station?
Scott Conners replied that he thought it was being built now. There
is a gap between the down stream sewer and this property. Things will
have to be worked out between the different governmental jurisdictions.
Chairman Hickey stated that if we approve 128 lots here, there will
be a problem right?
Scott Conners replied that he did not feel that we could approve 128
lots in light of the news we have received from Tallmadge Twp.
M. Ferris-Young asked about the logic of having sidewalks on both
sides of the road.
S. Conners stated that we cannot have sidewalks that just stop at a
point, this is going to be the main entrance to a plat of about 140
homes, and this entrance is the funnel into that entire area. It is
where all the vehicles and pedestrians are going to go and they are
going to come out to Richmond. Hopefully someday Richmond will have
sidewalks. We need to separate vehicles from pedestrians. The last thing
we would want to do is to have a sidewalk simply stop there and promote
pedestrians crossing the road at the busiest point for this whole
development. That is why we want sidewalks on both sides of the street.
We try to be flexible and we feel this is a flexible solution to allow
that sidewalk to be built right up against the curb. We think in this
case it will provide additional space for buffering for the existing
homes that are there.
M. Ferris-Young asked why is this a public street?
S. Conners replied that the City has not required that this be a
public road. It is something that most developers want to see. Then the
association does not have to worry about a fund to pay for road repairs
in the future or to make sure that the plows get out there. That is
taken care of when you build it to the public standard in the beginning.
Chairman Hickey stated that if we move Gordonshire a little further
to the west, since we are talking about buffering, that home is a long
way from the lot line, and the home to the east is very close to the lot
line. If we gain an extra 4 ft. and put the sidewalks on the one side
closer to the curb and the other side standard, it would be good. He
felt perhaps it could be adjusted.
Scott Conners stated that he did not think that this could be
approved with more than 113 lots in future Phases going in a westerly
direction.
M. Houseman stated that we are dealing with the first 17 lots in
Phase 1 and they are going to have to come back for each Phase.
Frank Wash stated that you are first looking at the entire final area
site plan, if nothing changes down the road. You are looking for
construction approval for the first Phase of final area site plan, which
is 17 lots. Also the site condo is for only Phase 1.
C. Rypma asked can we go ahead with Phase l or do we have to look at
Phase 1 again?
Scott Conners replied that now is the time to look at the design for
Phase 1 to see if it can be adjusted or tweaked to allow for additional
homes from Phases 2 or 3 for sewer to come in that direction. If we wait
until Phase 2, they might miss the opportunity to adjust the grades in
Phase 1 to take into account more lots. There is a danger in simply
approving it, but if we point it out, we can probably move past that and
let the solution be worked out in Phase 2 so that they have other
options to look at. There are a couple of ideas on how they can reroute
the sewer to let some of those lots go to the north. Do I think they can
get all of them? I do not know. It depends on the details and we have
not talked about those details yet.
Steve Versluis stated that in looking at lots 8 – 11, they are
talking about conservation easements to protect those wetlands. At what
time is that imposed or negotiated? Do we mandate that as a condition?
He went on to say that he is concerned about those wetlands being
encroached upon. He asked who polices wetlands and encroachments?
S. Conners replied it is typically the neighbors. MDEQ is the
regulatory agency.
M. Houseman stated that when you look at the wetlands as established
by the DEQ and the surveyors it often looks much bigger on the plans
than what is really impacted on the site. He went on to say that he is
not alarmed about lots 8 - 11.
Scott Conners commented that signs could be put up that say
conservation easement do not disturb. That happens all the time.
C. Gornowich felt that would be a good condition for approval.
Carol Gornowich moved and Curtis Rypma supported the motion to open
the public hearing. Motion carried.
Frank Wash commented that Deb Brown should obstain due to an ongoing
conflict of interest as determined by the City Attorney.
Mr. VerWoert commented that this plan has been approved by this body
twice. He then showed the site plan with explanations. He feels it is
redundant to have two sidewalks. He proposed moving the road 4 ft. to
the east and wants to add pine trees as a buffer. He stated they are
trying to work with the adjacent neighbors. Phase 2 will connect to
Kenowa Ave. so this will not remain the main entrance.
Frank Wash stated that the City standard cross section for a public
street shows sidewalks on both sides of the road and there is no
variance procedure for that. We could dovetail down the sidewalks to the
road edge for 200 ft. from Richmond to get past those homes.
Scott Conners stated that we did talk about taking advantage of the 4
ft. extra on the west side of the road, instead of being 33 ft. from the
east side, we could be 33 ft. from the west side and pick up an extra 4
ft. and have quite a buffer area on the east side with that short
stretch of 8 ft. concrete sidewalk up against the back of the curb on
the east side. Those were our suggestions.
J. Hickey, Chairman stated that we are saying that both sidewalks
have to go in and we would like to move it as close to the west as we
can.
Dave Hendershot, project engineer stated that if we add sidewalks to
both sides we are going to have trouble fitting the grading of the road
and sidewalks in. We may have to look at a retaining wall. By designing
it the way we did, we are able to grade that area out and fit everything
in there.
Mr. Ver Woert stated that one of the main concerns of this body was
the traffic on Richmond. We have tried to alleviate traffic on Richmond
to get traffic to Wilson Ave. We are trying to get a road that will
connect off of Wilson Ave. and that makes for a nice gentle bend for
traffic flow. He stated we have done a lot of drainage studies here. The
desire for this design was drafted here with you.
Scott Conners replied that we get into a dangerous situation here
with staff because we allow conditional approval. especially on
tentative plans. This is exactly why we have that danger. That is why we
are apprehensive about giving conditional approvals because we see minor
items that need to be worked out, and we say we can work it out between
now and the final plan. We get to the final plan and nobody wants to
work it out. All of the professionals that the City has on staff, have
agreed that they want to see this happen. It was brought up before and
brought up again and now the Planning Commission can decide what they
want to do. He stated he felt it was important to note that this is
something we have been looking at all along. The professionals on staff
are of a consensus on this idea.
Mr. VerWoert stated that he never got any paperwork on this.
Tom Greeno stated that the bend in that road was discussed right
here.
Mr. VerWoert stated that he felt we were all in agreement on the
drainage study and detention pond and there are no issues with the
association by-laws and maintenance. We have had a meeting on the
downstream outlet and improving that. There are some areas here that
have wetlands. There are 4 to 8 inches of water here in the wettest time
of the year. In a wetland like this you are allowed to mow and maintain.
You are not allowed to dredge or dig or to fill. This will be backyards
and will not be nasty, wet stuff. As Phase 2 is constructed, there will
be grading for the backyards. We are not allowed to fill or cut into
that area but as the project gets under way, the water will drain from
the backyards. Part of the DEQ permit will require us to put up signage
to say no filling as well in some areas to have a split rail fence to
prevent some of that happening. It will also be recorded in the deed
with the site diagram of the lot.
Steve Versluis commented that he would like to see some kind of
delineation that there are wetlands here.
Mr. Ver Woert replied that state law requires conservation in these
areas. It has to be recorded as wetlands. The DEQ requires signs in some
areas.
T. Greeno stated that he felt the Planning Commission would like to
see each lot individually signed where needed.
J. Hickey, Chairman stated that we have a letter here from Mr.
Conners, our Engineer who has 15 items on this letter that need to be
addressed and Frank Wash has a letter here with 9 items under the final
site plan that need to be addressed and two items under the condo plan
that need to be addressed. He went on to say that we have heard enough
until you come back with the answer to these 26 items, we do not want to
hear any more and you were told that the last time you were here. You
have come back with the same identical plan. We are going to table this
until you can back with an answer to these questions so we can make a
decision that will benefit you and the citizens of Walker.
Glenn Deckinga, 4684 Richmond asked if this project is going to be
limited to 145 lots?
J. Hickey replied that is one of the questions in the staff letter
that we would like answered.
Mike Houseman moved and Carol Gornowich supported the motion to close
the public hearing. Motion carried.
Tom Greeno moved and Carol Gornowich supported the motion to table
this request until the staff is satisfied with the 26 conditions listed
in these two letters. Motion carried.
Case #05-447: Ultimate Tooling – Site Plan Review
Chairman Hickey read the request for site plan approval for a 10,000
sq.ft. addition to the existing building located at 2943 South Wilson
Ct.
Planner Wash stated that Ultimate Tooling was approved originally in
August 2004 for a building of 20,000 sq. ft. and now they are requesting
an addition that they showed on their original plan. The site plan shows
the addition to be south of the site and there is a conservation area to
the southwest of the property. The site is completely designed and built
out according to the standards of the ordinance. There is really no
staff report on this property but if this project is approved, we will
need 5 sealed copies of the plan to be distributed to the city
departments prior to the building permit being issued.
Scott Conners stated that we went to site plan review with this and
we had some very tough issues to work through and within a few days the
applicant made some good decisions, and got us a revised plan.
C. Rypma asked if the building was signed?
The applicant replied no it is in the process.
C. Rypma moved and M. Houseman supported the motion to approve the
site plan for 2943 South Wilson Ct., Ultimate Tooling as it does meet
the standards set forth in the City of Walker Zoning Ordinance with the
following condition:
1. The applicant agree to all of the conditions in the Planning
Director’s letter dated 12-13-05.
Motion carried.
T. Greeno moved and C. Rypma supported the motion to adjourn the
Planning Commission meeting at 9:05 p.m.
Motion carried.
______________________________ _______________________
Administrative Approval Carol Gornowich, Secretary
Walker Planning Commission
Government |
Departments | Community
| Resource Center
Contact Us |
Search |
Site Map |
Home | Site Use Policy
The City
of Walker, Michigan
4243 Remembrance Rd. NW
Walker, MI 49534
(616)453-6311
City Hall hours: Mon-Thursday from 7:30am to 5:30pm. Closed Fridays
All information © 2012 City of
Walker
Contact Us!
If you would like to leave general
comments about the website, click here.
Click here to report technical problems with the website.
|