Present: M. Huizenga, C. Gornowich, M. Ferris-Young, D. Brown, C.
Rypma, S. Versluis, T. Greeno, Chairman Hickey. Also Present: F. Wash,
Planning Director, P. Dlouhy, Planning Asst., Pete LaMourie, City
Traffic Consultant.
Orchard Park team: Jim Bossenbroek, Zach Bossenbroek, Gary Smith,
Jeff Hundley, and Mick Barney, of Triangle Associates.
Chairman Hickey opened the meeting and Member Rypma gave the
invocation.
Approval of Minutes 7-18-07
Motion by T. Greeno, supported by C. Gornowich, to table the minutes
pending a minor correction. Motion carried.
General Public Comment
There were no public comments at this time.
Case #06-452 – Orchard Park PASP Amendment – Work
Session
Chairman Hickey read the agenda item - the work session with the
realigned development team regarding proposed revisions to the approved
Preliminary Area Site Plan for the Orchard Park MPUD. The proposed
revisions include a change of development phasing plus a redesigned
preliminary area site plan and road/building layout for District E, the
tourist-oriented retail area.
The Planning Commission met with the developer team in revising their
proposal to amend the Orchard Park Preliminary Area Site Plan.
Planner Wash asked the planning commission to compare and contrast
the approved PASP, the proposed amended PASP and the sketch created by
staff.
Chairman Hickey stated that we want to get over some of the hurdles
with respect to the location of a prospective water park, the big boxes
along the expressway, and saving the road around Cabela’s in District E.
With respect to the big boxes along the expressway, Jim Bossenbroek,
owner, stated that the idea of how to place buildings on the site is
something of an art and science. He related that you have to have 1 or
more anchors with the second anchor a phantom anchor; and without that
shopping becomes more transient, more strip mallish and not as
attractive. Bossenbroek stated that a good possibility for a big box
tenant is J.C. Penney with a 305 x 305 sq. ft. building. He related that
historically they have been a solid anchor at Woodland Mall and
Rivertown Mall, etc. Jim Bossenbroek related that they have a more
successful upscale prototype as a stand-alone, as in the new Brighton
lifestyle mall. He indicated that the retail has to work for them and
for us.
Jim Bossenbroek stated that there are projects around the country
that have done this very well with the big boxes and he would like to
take staff along on a trip to visit these sites. Bossenbroek related
that the big box uses with different materials, heights, cupolas that
mix things up visually have done well. He indicated that they will use
the latest design techniques but can’t be limited to 50,000 sq. ft.
boxes, as he doesn’t know his users yet. Bossenbroek cited developments
in Florida, Texas, Vegas, and California where the big boxes have been
integrated well, but there is nothing like this in Michigan.
Gary Smith related that there are 2 levels: the site plan aspect –
where we can plan what we want, and the architecture – the look and feel
of the development.
Smith stated from a site plan standpoint, the retailers still have
very traditional needs with close proximity of parking to their
buildings. Chairman Hickey added that Planner Wash’s sketch has parking
all the way around and he likes this configuration of buildings. The
Planning Commission concurred.
Member Versluis asked, apart from the architectural standards or even
the big boxes, is J.C. Penney the standard type of tenant the developer
plans to bring in? Versluis stated that originally this was heralded as
an "upscale" project. Jim Bossenbroek stated that J.C. Penney’s
demographics are higher than the demographics of this area. Member
Versluis stated that he is still looking for uniqueness, not the same as
all the other shopping centers in the area. Gary Smith stated that it is
still the intent of the town center to have higher end fashion.
Jim Bossenbroek stated that they need some anchor retail along I-96.
Otherwise, there is not enough for the infrastructure and Cabela’s to do
the TIF. He felt that this is a great place for J.C. Penney along I-96
and creates this destination to ultimately support the town center.
Bossenbroek stated that there are not enough housing demographics to
support the town center now. Cabela’s has to go up, then the other
retailers along I-96, then the town center.
Member Versluis stated that it sounds like this will be just like
everything else, just like Brighton, this is fairly typical everywhere
he goes. He is not looking for fairly typical, he is striving for
uniqueness. Bossenbroek stated that there are very interesting users in
the Brighton Mall where J.C. Penney is an anchor. Versluis stated that
he thought this would be exclusive with unique stores that you couldn’t
find just anyplace. Apart from Cabela’s, he doesn’t see this as being
original.
Chairman Hickey asked, what uses does Cabela’s bring with them? Jim
Bossenbroek stated hotels, restaurants, and strip retail. Bossenbroek
gave an example of in Kansas City, a Nebraska furniture mart - 600,000
sq. ft., a Great Wolf lodge plus another water park all went in this
development.
Gary Smith stated that they still intend a walkable, higher end,
exclusive shop project, as in the original plan. All of that will be
surrounding the town center. We are still talking about all of this,
only in a different configuration. Cabela’s, the tourist oriented anchor
with associated retail, restaurants and hotels is still the plan. Gary
stated that this new plan is better than the original plan.
Gary Smith stated that the developer is losing valuable ground with
Cabela’s. He asked, how can we incorporate these uses and get it into a
format that is close to the intent of the master plan? He felt that the
new plan shows well connected, well thought out synergistic uses.
Member Greeno stated that until they know if one of the boxes is JC
Penney or whatever, they don’t know where to draw the boxes. Greeno
asked if the sub-area plans and guidelines need to be changed? Gary
Smith stated no they still plan on the intended uses, but until we know
the users we just don’t know.
Planner Wash stated that the Planning Commission has a zoning
ordinance based obligation to approve the preliminary area site plan
with basic land use, orientation of buildings, basic idea of where the
development is going. In other words, the framework has to be approved.
Planner Wash asked the planning commission, is District E changed or is
it consistent with what was approved in the master plan? Is the
pedestrian access and open space suitable for outdoor retail, vistas,
streetscapes, views to and from the site? Wash stated that the
preliminary area site plan may not be set in stone, but there is a lot
of intent that goes into that sketch plan.
Member Ferris-Young stated that a high end make up store didn’t make
it at Rivertown and that all of the examples of successful developments
were located in warm climates, but none mentioned in Michigan. Jim
Bossenbroek stated that they have strict design standards in Austin,
Texas and everyone wants to locate there. He related that J.C. Penney,
Target superstore are included in that power center and they also have a
gathering area with small shops, and the architecture was done right.
Bossenbroek stated that you don’t see that much in the Midwest, maybe in
Chicago, but not in Michigan.
Member Ferris-Young suggested that the developer consider heated
sidewalks for the Walker development. Jim Bossenbroek stated it would
not be cost effective, but possibly in the town center area.
Planner Wash asked of the developer, on their site plans, to point
out on this site where are they going to locate all of this creativity?
Gary Smith asked, what will be the next step once the preliminary area
site plan gets approved? Planner Wash stated the construction plans in
conjunction with the final area site plan approval. Planner Wash stated
in the first version of the preliminary area site plan, all of this
discussed creativity was shown on the plans. He asked, where is it in
this revised plan? He then reviewed his sketch, showing the box sizes,
architecture, fountain, etc. He added that he would like to see this
level of detail in the developer’s plans as was in the originally
approved preliminary area site plan. Planner Wash asked, according to
our master plan, what does the developer envision? Mr. Bossenbroek
stated a tourist orientated anchor – Cabela’s, a hotel, restaurants,
service oriented uses, and as a default, entertainment, or theatre or a
water park.
Member Rypma stated that he anticipated retail along I-96, it is just
a matter of how much. Member Rypma likes what he sees on Planner Wash’s
sketch drawing. He doesn’t see a problem with a big box or with
entertainment and retail at this location. Chairman Hickey agreed that
if store 1 and 2 went together and it looked like 3 stores, he wouldn’t
have a problem with it. Member Gornowich added, "depending on how it’s
done".
Gary Smith stated if J.C. Penney commits, then they would have a good
general retail anchor.
Planner Wash asked, is the Planning Commission comfortable with the
plans as submitted by the developer? If so, they should move it forward.
Member Rypma likes the sketch that Planner Wash put together. He
suggested that the developer come back with something close to that.
There was concensus of the planning commission to be in favor of Planner
Wash’s sketch drawing. Rypma stated when the developer has a tenant he
will have to come back before us anyway. He is comfortable with that.
Gary Smith then pencil sketched a couple of ideas with respect to the
big boxes along I-96 and building configuration, and reviewed it with
the planning commission.
Jim Bossenbroek stated that for the 425 agreement and to finance the
TIF, financers will be asking, "what approvals do we have"? He stated
what is viable is medium size boxes, Cabela’s, and some outlots and some
retailers. Bossenbroek stated that he has to show his lender that the
City is ok with medium size boxes along the freeway.
Member Huizenga stated that he first found the boxes along the
freeway offensive. In Planner Wash’s drawing, it breaks it up nicely.
Huizenga also wants to see something for public space along the ravine.
We as a planning commission need to decide what we want, have the
developer draw it, come back and then we decide whether we agree to it,
then the final area site plans will come back. Huizenga doesn’t like the
big boxes along the freeway, he likes Planner Wash’s idea.
Planner Wash stated that the planning commission has, under the
zoning ordinance, the power of uses not allowed, which we have done,
such as an auto dealership, etc.
Member Versluis stated that he is concerned about the stores that
will be here. Once the die is cast here, it will dictate what stores
will come. He is concerned about big boxes.
Jim Bossenbroek gave an example in northwest Minneapolis (Arbor
Lakes) where it started out as a 300-400 acre power center and grew to
an upscale town center/life style center. Bossenbroek stated that if
Cabela’s and tenants come, and traffic increases, etc. this could become
an Arbor Lakes.
Member Versluis stated that what was originally proposed here was an
upscale development, and the people felt they deserved something better.
There was a recall, etc. Versluis stated that this site deserves the
best, and he wants it to be a Mecca, and he doesn’t know if this is that
type of development. Jim Bossenbroek asked Member Versluis who he would
like them to have come? Bossenbroek stated that the market does not
support a Nordstroms, as the demographics do not support it. Realtor,
Jeff Hundley agreed with Jim Bossenbroek. Hundley stated that they would
like to see Pottery Barn and some others come and he thinks it is
possible.
Member Versluis stated that this is his chance to do this right as he
has a passion for it. Bossenbroek stated that Commissioner Versluis has
to understand the economics, the cost of the infrastructure, cost of
land, cost of clean up, incentives given to Cabela’s, etc.
Jim Bossenbroek assured Steve Versluis that he wants to get the
highest and best scale tenants to be viable. He has to be realistic
about what he needs to get the job done, such as get Cabela’s first,
etc. Gary Smith stated that the special place that Member Versluis is
talking about is still here. Mr. Bossenbroek stated that he wants to
make it successful first before the East Beltline does.
Member Rypma asked if it would be 2 years before the town center was
built? Mr. Bossenbroek stated he didn’t think it would be that long, and
once Cabela’s comes, a lot of users will follow.
Member Greeno stated that he wants it to be successful all the way
around.
Planner Wash added that the layout, design, orientation, in addition
to all the details, needs to be agreed upon by the planning commission,
per the standards of the zoning ordinance.
Member Huizenga asked if we could set the standards for the big
boxes, such as length of the walls along the interstate?
Member Rypma stated that he thought we had a resolution that referred
to the size of the big boxes, etc. Planner Wash stated that was only a
draft.
Chairman Hickey asked Mick Barney and Gary Smith if they could put a
front façade on the back of the building that cannot be accessed, with
windows for looks? Smith thought that was a possibility. Chairman Hickey
asked Gary Smith to come back with a drawing that shows this.
Gary Smith stated that these box buildings along I-96 can be
staggered, cantilevered, etc. but they have to meet the parking
requirements.
Issues were discussed regarding public safety and public access
around the buildings.
Member Ferris-Young stated that she would prefer to see a "bubble"
drawing from the developer rather than the finished product at this
stage. Planner Wash related that we will need more than a bubble
drawing, as we need to follow the standards of the zoning ordinance.
Member Huizenga stated that he still prefers Planner Wash’s drawing
with the smaller boxes on angles, etc. He felt that it was ok to combine
the buildings, limit the square footage, with buildings looking over the
ravine.
Member Gornowich agrees with all of the comments made by the other
commissioners. She does not want the box buildings in a straight line,
agrees with Planner Wash’s concept drawing, but prefers the
fountain/sitting area more in the center of District E.
Member Ferris-Young asked the developer to provide pictures and
examples of tenants with high probabilities. She likes the offset
buildings shown on Planner Wash’s concept drawing.
Member Rypma agrees and likes Planner Wash’s concept best. It is
creative and is what we want to see.
Planner Wash asked the developer to give us the preferred option for
a preliminary plan with a couple of alternatives. He reminded them that
we have an ordinance to follow.
Member Brown also likes Planner Wash’s option, and doesn’t like the
straight line of box buildings. She doesn’t have a problem with J.C.
Penneys.
Member Greeno stated that we need to get the right wording to the
developer so he can get what he needs to get done. Greeno felt that we
need a road behind the box buildings for safety, and the right design
standards. He concurs with the commissioners about Planner Wash’s
concept of the layout and configuration of buildings.
Chairman Hickey asked where the parks will be located in District E?
Gary Smith stated that they could add some trails around this district.
Hickey stated that we need a park or plazas. Gary Smith will get
pictures of the development in Austin.
Chairman Hickey asked if it was still the developer’s intent to have
a water park on the east side of Bristol? Mr. Bossenbroek stated yes and
reviewed the location on the map.
Zach Bossenbroek stated that they will be submitting an application
soon for that 60 acre site. Member Gornowich asked if the proposed water
park site would utilize 5-6 acres? Mr. Bossenbroek stated yes.
City traffic consultant, Pete LaMourie, stated that the traffic
impact study will have to be expanded to include the 60 acres east of
Bristol Ave. He felt that the drops in density may offset the traffic,
but felt that the City should ask for a revised traffic impact analysis
to see where the traffic distribution will occur.
Planner Wash related that he will meet with the owners of English
Hills Golf Course next week to coordinate plans for the Northridge
extension.
Member Greeno stated that all of the roads, traffic, and
infrastructure should be considered out 10 years with respect to the
Bristol, Walker, and 3 Mile Road, and cost sharing of same between the
developers.
Chairman Hickey stated that we have the 4 Mile corridor study done
and in place.
Member Gornowich asked about improvements to the area where there is
1 lane under the railroad south of 3 Mile on Bristol Ave. Planner Wash
indicated that Scott Conners has been working on that via the capital
improvement process. Pete LaMourie stated that there is federal
government protection for bridges serving railroads. LaMourie felt that
far down Bristol the percentage of traffic will be smaller. He felt that
the developer will have to find a way to mitigate the impacts on 4 Mile
and Alpine. Jim Bossenbroek stated that is an already failed
intersection.
Planner Wash stated that we will need a revised traffic impact
analysis, including the percentage of overall trips on Bristol, north of
3 Mile.
Chairman Hickey asked the planning commission if anyone had a problem
with the location of the water park on the east side of Bristol? The
planning commission was ok with this location.
A recap of items for the developer team to incorporate on their
Preliminary Area Site Plan amendment as follows:
Ensure public safety access around all buildings.
Avoid large, blank, "rear of box" wall along I-96.
Revise the design standards matrix and architectural commitments
documents to reflect the concepts shown on the PASP graphic.
Maximize ravine overlook with public activity areas and decorated
rears of buildings.
Maximize viewshed with focal points from I-96 and North Ridge
into District E.
Add design concept details for public activity spaces within
District E.
Create a "primary" PASP and alternatives for the PC to review.
Provide photos from other developments showing the level of
design detail and creative components that will be incorporated in
District E.
Provide square footage estimates for probable tenants.
Expand traffic impact study to include the 60 acres east of
Bristol Avenue (Staff and Pete LaMourie will meet with the Orchard
Park team and the English Hills site team on 8-7-07 to discuss a
comprehensive traffic impact study. MDOT, the Kent Co. Road
Commission and Alpine Twp. will be brought into the process as soon
as possible.
Member Huizenga stated that he looks forward to more opportunities to
work with the developer and felt that it has been a good process thus
far.
Commission and Staff Update
Planner Wash is looking for 2 planning commissioners to be on the
Standale RFQ committee. Chairman Hickey and Member Huizenga volunteered.
Millenium Park - maintenance building
Planner Wash reviewed the revised maintenance building plans for
Millenium Park which were basically flip-flopped on the site.
Motion by D. Brown, supported by M. Ferris-Young, to allow staff to
approve these alterations. Motion carried 8-0.
Adjournment
Motion by T. Greeno, supported by C. Gornowich, to adjourn the
meeting at 9:40 p.m. Motion carried.
_____________________________ _____________________________
Administrative Approval Carol Gornowich, Secretary
Walker Planning Commission